Question · Action Scorecards 2025
Two-tier criteria
First tier criteria met if the council has a mandatory requirement for tenders to do any of the following:
- Demonstrate how they will meet energy efficiency requirements or minimise energy consumption.
- Demonstrate how they will minimise waste in their products and services. This could be through recycled, natural, biodegradable or renewable materials being used, through not using single use plastic or other non-recyclable materials or through ensuring products and services last for as long as possible.
Second tier criteria met if the council's procurement policy includes any of the following:
- The council aims to source low or zero carbon energy wherever possible.
- The council aims to phase out the use of fossil fuels from their council fleet.
- The council references the waste hierarchy in its policy, for example by stating that it encourages the councils to consider if repeat procurement requests are always needed.
nan
There is no comparison between 2025 and 2023 data because this question's maximum score was modified in 2025.
| Council | Score | Evidence |
|---|---|---|
| Greater London Authority | 2/2 | |
| Greater Manchester Combined Authority | 1/2 | |
Cambridgeshire and Peterborough Combined Authority
| 0/2 | Evidence doesn't meet criteria |
Liverpool City Region Combined Authority
| 0/2 | No evidence found |
South Yorkshire Mayoral Combined Authority
| 0/2 | No evidence found |
Tees Valley Combined Authority
| 0/2 | Evidence doesn't meet criteria |
West Midlands Combined Authority
| 0/2 | No evidence found |
West of England Combined Authority
| 0/2 | Evidence doesn't meet criteria |
West Yorkshire Combined Authority
| 0/2 | Evidence doesn't meet criteria |