Question · Action Scorecards 2025
Points awarded if the combined authority has a map detailing where solar energy can be built within the whole combined authority area.
Points awarded if the combined authority has a map detailing where wind energy can be built within the whole combined authority area.
Points awarded if the combined authority has a map detailing where a district heat network can be built within the whole combined authority area.
This can include if the combined authority has conducted Local Area Energy Mapping - but only if the mapping done within the area contains the mapping for either district heat, wind and/or solar.
Criteria is not met if a constituent authority has produced maps for their own area but the combined authority has not done the mapping across the whole of the combined authorities area.
Combined Authorities
| Council | Score | Difference2023 | Evidence |
|---|---|---|---|
| Greater London Authority | 2/3 | -- | |
| Greater Manchester Combined Authority | 2/3 | ▼ -1 | |
| West Midlands Combined Authority | 2/3 | -- | |
Cambridgeshire and Peterborough Combined Authority
| 0/3 | -- | None |
Liverpool City Region Combined Authority
| 0/3 | -- | None |
South Yorkshire Mayoral Combined Authority
| 0/3 | -- | None |
Tees Valley Combined Authority
| 0/3 | -- | None |
West of England Combined Authority
| 0/3 | -- | None |
West Yorkshire Combined Authority
| 0/3 | -- | None |